Home / Projects
Iron On The Ground

Projects that ran on deadline and budget.

From 47-mile highway corridors to a single-ranch soil prep campaign — here is a selection of jobs where our equipment made the difference.

Track Record

The scoreboard behind the jobs below

140+
Projects Delivered
18M+
Acres Worked
100%
Jobs Finished On Time
14
Active States
Portfolio

Six jobs. Six different challenges. Same result.

These are not renders or proposals — they are completed jobs where our machines were on the ground, and the customers signed off on time.

Infrastructure Highway 290 Expansion Corridor
Texas Hill Country, TX  ·  2023

Highway 290 Expansion Corridor

A fleet of dozers and excavators deployed across 47 miles of right-of-way — clearing, grading, and drainage trenching. Over 12,000 operating hours logged with zero unplanned mechanical downtime.

Agriculture Full-Season Land Prep Campaign
Waco, TX  ·  2022

Full-Season Land Prep Campaign

A 3,200-acre cattle and row-crop operation needed brush clearing, terracing, and deep subsoiling completed before winter wheat planting. All three phases delivered on the agreed schedule.

Commercial Distribution Center Foundation Package
San Marcos, TX  ·  2023

Distribution Center Foundation Package

Excavators and a directional bore unit supplied for underground utility installation on a 480,000 sq ft logistics facility — staged to keep the general contractor on critical-path milestones.

Utilities Rural Water District Main Line
Cameron, TX  ·  2022

Rural Water District Main Line

Compact excavator and directional bore coordinated for a 14-mile water main installation across active farmland — completed two weeks ahead of deadline, ahead of a drought-season restriction window.

Municipal City Park & Multi-Use Trail
Georgetown, TX  ·  2024

City Park & Multi-Use Trail

A wheel loader and twin skid steers handled material staging and precision finish grading along 2.4 miles of mixed-use trail — operating within established oak root protection zones throughout.

Oil & Gas Permian Basin Caliche Lease Roads
Midland, TX  ·  2024

Permian Basin Caliche Lease Roads

Four dozers and a motor grader built 22 miles of all-weather caliche access roads across active drilling pads — repeated 48-hour mobilization windows met without a single missed callout.

Got a job that needs the right iron on site fast?

Send us the scope and we will recommend a machine, coordinate transport, and get you a timeline.